Engineering in Practice
Date, Time
Date – 28 October 2023 (Saturday), 11:30am –01:00pm
Venue:
Assembly at Po Shan Drainage Tunnel – Landslide Sci-Tech Chamber, Po Shan Road, Mid-levels
Location Highlight
The Po Shan Drainage Tunnel consists of a pair of drainage tunnels with 3.5m diameter and a total length of 500m. In 1972, a catastrophic landslide happened in Po Shan hillside due to high groundwater levels. The disaster shattered numerous homes and took away 67 lives. To prevent similar cases from happening, the Geotechnical Engineering Office (GEO) of the Civil Engineering and Development Department (CEDD) decided to lower the groundwater table by installing horizontal drains, in hope to improve the stability of the hillside against large-scale slope failure. However, in early 2000s, monitoring data shows that some horizontal drains have a decreasing trend of water outflow. Therefore, the GEO has designed the Po Shan Drainage, an innovative and sustainable groundwater regulation system with an automatic real-time groundwater monitoring system. The system allows GEO to control the groundwater levels, reducing the risk to public safety.
Fee
Free of charge
Registration & Enquiries
For enquiries, please contact Mr Nicolas Lam (61314311) or Miss Jane Leung (91339066) or via email: enq.cvd.hkie@gmail.com.
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.