MTR Shatin to Central Link (SCL) Works Contract 1128 is part of the new strategic rail corridor from Shatin to Central District. It comprises twin rail tunnels constructed by Tunnel Boring Machine (TBM) from Causeway Bay Typhoon Shelter to Admiralty Station, under the most congested urban setting of the northern shore of Hong Kong Island, specifically the Eastern Approach Section (EAS) between Causeway Bay and Wanchai Sports Ground. The TBMs had excavated under live bridge structures (Canal Road Flyover, Hung Hing & Causeway Flyovers) without road closure.
Based on the proposed SCL alignment, the proposed tunnels either clash or affect existing these bridge structures and their foundations. In order to minimize the effect of the tunneling works, an underpinning scheme for these bridges is applied to facilitate the tunnel construction works. 3D finite element modeling was used to estimate the movement of bridge under TBM tunneling works. Based on the modeling results, temporary jacking frames with hydraulic jacking system are used to support the live bridges to keep at their original position.
Fee
Free of Charge.
Speakers
Ir Irene Sin Ting Liu Senior Design Management Engineer (Civil)
Ir KL Lee Project Director of SCL Contract 1128
Ir Charles Luk Bridge Team Leader of SCL Contract 1128
Ir Kingston Yu Senior Site Engineer of SCL Contract 1128
Registration & Enquiries
The number of participants is limited to 80 and priority will be given to members of Civil Division and previous registered participants. Please complete the online registration at http://cv.hkie.org.hk. Email registration will not be accepted. Only successful applicants will be informed by email.
For enquiries, please contact:
Ms Shanshan Wang via email: hkieciviltechnicalmeeting@gmail.com
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.