Engineering in Practice
Date, time & venue This is a design-and-built project to expand and relocate a fresh water and a salt water service reservoirs into a rock cavern, in order to vacate the site for the Centennial Campus to be built by HKU. Drill-and-break method is used to eliminate the safety issue to the neighbouring residents.
|
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.