Engineering in Practice

Events and Activities

Technical visit to Shenzhen Metro Line 4

Date, time & venue 
2009-10-10;Whole day;Shenzhen Metro Line 4

MTR Corporation commenced the construction of the Phase 2 of the Shenzhen Metro Line 4 in mid 2007. The extension includes about 15.8 km long tunnel and 10 underground and elevated stations. Tunnels are being constructed using drill-and-blast method and Tunnel Boring Machines specially built for this project.

This extension is planned to be opened by mid 2011. Upon completion, the extension will form a vital part of the Shenzhen Metro System.

The visit is jointly organised by AMC and CV Divisions


Assembly time and details of venue are to be advised.

HK$100 (including traffic arrangement to and from the assembly venue at Shenzhen and the site).

Prior registration is required. The number of participants is limited to 30 and applications will be accepted on a first-come first-served basis. For registration, please complete and return the Standard Reply Form by Fax: 2242 6887 or via Email: amc.hkie@gmail.com. Successful applicants will be notified at least 7 days before the event. For enquiries, please contact Mr David CHAN at Tel: 9628 9015. Attendant certificate will be available.

 

Registration
* Please fill out this form completely