Engineering in Practice
Date, time & venue
(Jointly organized with Environmental Division of HKIE)
Programme Highlights The project involves upgrading the flood protection standards in northern Hong Kong by building a 11km main drainage tunnel extending from Tai Hang to Cyberport. There will be 34 stormwater intakes and a total of about 8km of adits connecting the intakes with the drainage tunnel. The drainage tunnel will intercept stormwater collected from Mid-levels and discharge it into the sea directly, to alleviate flooding in the lower catchment of Northern Hong Kong Island. The main tunnel was constructed with two double shield Tunnel Boring Machines (TBM). The adits are currently constructed by drill and blast technique with the majority of the intake drop shafts being constructed by raise boring method. Attendees to this technical site visit will have an opportunity to gain insights into the ongoing construction works.
Assembly Placewill be advised to successful applicants.
Registration & Enquiries The event is free of charge. For registration please contact Ir Eric Ma/Ms. Farah Mok at Tel: 26856201 or via Email:farah.mok@aecom.com. |
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.