Engineering in Practice
Date, time & venue
Speakers: Ir K.Y. Leung, Associate Director (Infrastructure), ARUP
Programme Highlights
The major objective of the Widening of Tolo Highway / Fanling Highway project is to relieve the traffic congestion problem and the anticipated traffic growth between Island House Interchange and Fanling by widening the existing 3-lanes dual carriageway to 4-lanes dual carriageway. The theme of this seminar is to introduce and unveil the challenges which have been encountered for bridge design works in Stage 1.
Fee: Free of charge
Registration & Enquiries Seats are limited to 80 on first-come-first-serve basis.
For registration please complete the on-line registration, which will be activated at 9:00pm 6 March 2013, by clicking the button at bottom.
At 10:00pm 10 March 2013, the number of applicants exceeded the capacity. On-line registration was CLOSED.
ONLY successful applicants will be notified on or before 16 March 2013.
For enquiries, please contact Ir S.S. Kong at tel. 90232209 or email sskong.hkie@gmail.com
|
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.