Engineering in Practice
Date, time & venue
2018-04-21;9:30am –12:00noon;Fanling Station Exit A1
Programme Highlight
The Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works mainly comprises site formation of about 23 hectares of land for provision of Boundary Control Point (BCP) buildings and associated facilities, construction of about 11km long dual 2-lane Connecting Road linking up the BCP with Fanling Highway, design and construction of the Hong Kong Special Administrative Region portion of vehicular bridges and pedestrian bridge crossing Shenzhen River, associated diversion/modification works at existing local roads and junctions, drainage, sewerage, waterworks and landscaping works.
Contract CV/2013/08 is one of the contracts for the Project. In this project, it included construction of a 4.6 km long dual two-lane trunk road (with about 0.6km at grade roads, 3.3km viaducts and a 0.7km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works.
This technical visit will start with a brief introduction to CV/2013/08 and follow by site walk to major facilities on site.
Fee
Free of charge
Registration & Enquiries
For enquiries, please contact Mr. Timothy Wong at Tel: 6926 1176 or via email: enq.cvd.hkie@gmail.com.
Copyright ©2018 The Hong Kong Institution of Engineers. All rights reserved.